CASE STUDIES:
Los Alamitos, California, Power Plant Outage 2009


PBS replaced water wall tubes in the Boiler’s upper water wall. Approximately 110 thin water wall tubes, 34 ft long, were demo and new tubes fit and welded.  A total of 14,600 ft of membrane, and 400 field welds were completed for the successful installation of the 110 water wall tubes. A 3.5” thick-wall safety release valve was replaced and additional boiler repairs were completed.  Over 10,000 man hours were expended on this project with zero injuries and zero time loss.

 

 

 